Berths & Operational Capacity
Phuoc An Port is strategically planned and invested to become a modern logistics hub, efficiently connecting to key industrial zones and the national transportation network.
Phuoc An Port project is divided into three phases. Phase 1 is currently in operations in October 2024, with total berth length of 900 meters, including 03 container berths and a handling capacity of 1.3 million TEUs/year. Phase 2 is expected to be operated in 2026, featuring a 1,880-meter berth length, 06 container berths and 04 barge berths. Phase 3 is scheduled for completion in 2028, with total berth length of 2,830 meters, comprising 10 container berths and 04 barge berths, bringing the total container handling capacity to up to 8 million TEUs/year.
(Phase 1)
by 2028
in the Phase 1 (expand to 420 metres in Phase 2 and 3)
in the Phase 1 (expand to 09 berths in Phase 2 and 3)
Capable of accommodating vessel up to 60.000 DWT
(expand in later phases)
- Infrastructure
Equipments
Phuoc An Port is equipped with modern cranes system and specialized vehicles – 100% electrically operated, contribute to reduce emissions and protect the environment. The equipment is comprehensively invested to efficiently meet the cargo handling and transportation demands.
Lifting height: 32m – 40m
Outreach: 40m – 50m
Lifting capacity: 40.6T + 10%
Lifting height: 18m
Lifting capacity: 40.6T + 10%
Total towing capacity: 75T
Lifting height: 15.1 m
Lifting capacity: 45T
Lifting height: 18.7 m
Lifting capacity: 9T